Skip to main content

Cookie settings

We use cookies to ensure the basic functionalities of the website and to enhance your online experience. You can configure and accept the use of the cookies, and modify your consent options, at any time.

Essential

Preferences

Analytics and statistics

Marketing

Changes at "Sumner Tunnel Restoration"

Avatar: Eric Ouyang Eric Ouyang

Title (English)

  • +Sumner Tunnel Restoration

Title (Español)

Description (English)

  • +

    "Corrosion and wear-and-tear have deeply impacted wall panels and gutters. There's exposed rebar on the ceiling, and even after resurfacing, pavement conditions are poor – a fact that should be obvious to anyone who drives the length of the tunnel. Ventilation, drainage, security, and fire suppression systems all must be brought up to modern code. At this point, we're well beyond patches and repairs: the only way to keep the Sumner Tunnel in service is with a top-to-bottom restoration."

    (Source: https://www.mass.gov/info-details/sumner-tunnel-restoration-project-history)

Description (Español)

Progress

  • +70.0

Scope

  • +MassDOT

Confirm

Please log in

The password is too short.

Share